Wind Turbine Construction Time Lapse (short) watch!
youtube.com — Time lapse of one of the PYCO 1 Megawatt Wind Turbines. The construction of this turbine took place from March 31st 2008 to April 4th 2008 in Lubbock Texas.
- 838 diggs
- digg it
all diggers (839)
The Digg Toolbar for Firefox lets you Digg, submit content, and keep track of Digg even when you're not on the Digg site. Download the official